Week of March 16-22, 2013

Lower Roswell Road Construction

Find out what's happening in East Cobbwith free, real-time updates from Patch.

  • Davidson Road to Willow Point Parkway – Monday through Friday: Expect periodic lane closures from 9 a.m. to 4 p.m. between Davidson Rd and Willow Point Pkwy with one lane open for your commute. The contractor will be grading and placing concrete. Weather Permitting – the contractor may continue asphalt paving between Hyde Rd and Asheforde Dr. EXPECT DELAYS
  • Willow Point Parkway to Timber Ridge Road – Monday through Friday: Expect periodic lane closures from 9 a.m. to 4 p.m. between Willow Point Pkwy and Timber Ridge Rd with one lane remaining open for your commute. The contractor will be grading, installing storm drainage, and placing concrete. Utility relocations should not affect your service. EXPECT DELAYS


Little Willeo Road Sidewalks Construction

  • Karls Gate Drive to Lake Fjord Pass – Monday through Friday: Expect intermittent lane closures from 9 a.m. to 4 p.m. with one lane remaining open while the contractor continues grading, placing concrete sidewalk and begins water main installation. Utility relocation should not affect your service.


Paper Mill Road Bridge Replacement

Find out what's happening in East Cobbwith free, real-time updates from Patch.

  • In May, Cobb County DOT will begin work on replacing the bridge and adding a pedestrian bridge over Sope Creek on Paper Mill Road. The new bridge will include a six foot sidewalk on the south side, providing access to the National Park Service trails. This project will result in closing Paper Mill Road at the bridge for approximately four months beginning once school breaks for the summer. Signed detour routes will be provided during construction.


I-285 Top-End Resurfacing Project - GDOT

  • Georgia DOT continues working on a $56 million resurfacing project on I-285. Crews will resurface 10 miles of I-285 between Paces Ferry Road in Cobb County and Ashford Dunwoody Road in DeKalb County. Most work will take place nights and weekends. The project is scheduled to complete in August. EXPECT DELAYS.
  • Please click on the link for more information:

http://www.dot.ga.gov/travelingingeorgia/TravelInfo1/WLC.pdf


Get more local news delivered straight to your inbox. Sign up for free Patch newsletters and alerts.

We’ve removed the ability to reply as we work to make improvements. Learn more here

More from East Cobb